Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Jan 25, 2023     40-6 Flap System step 1-4 New Actuator - (2 hours) Category: Fuselage
I ordered the new Flap Actuator with integrated position sensor from VANS. This requires the removal of the current Flap Actuator with its position sensor. In addition it is necessary to replace the old support bracket with a new bracket provided in the new Flap Kit.
I drilled out 7 -4 rivets from both sides with some difficulty, however the holes look good as there are no visible enlargements.
I cut and deburred the different parts, final drilled the #40 holes for the 6 platenuts and the #12 holes for the bolts. I primed the parts with a commercial primer.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.